- Extended setup times for NPI runs
- Lack of material availability at time of scheduling
- Lengthy material changeover times between work orders
- Non-optimized production (including imbalanced loads on lines and schedules)
- Unplanned material shortages
- Underperforming asset utilization of equipment (specifically SMT)
- What material is needed (Part Number)
- From Where (Location in Stock)
- Delivered to location (Line and Machine)