“These projects represent an investment in the sustained further growth of the entire RAFI Group,” explained Dr. Lothar Seybold, CEO of the RAFI Group.
“The construction of a new production plant in Bad Waldsee is a clear statement of commitment to the region as a business location. It creates new, crisis-proof jobs here,” said CFO Lothar Arnold.
Berg site revamp
The second major project is a revamp of the location in Berg, Baden-Württemberg. It was launched in 2022 and RAFI has now completed the first construction phase. As part of its growth strategy, the manufacturer is investing a sum in the high two-digit millions for the three-year renovation and energy-saving modernization project. It involves successively fitting the buildings with new, climate-friendly roofs, façades, and glazing. The physical effects are expected to deliver energy savings of up to 45% and a significant reduction in CO2 emissions of around 340 tons per year. The first construction phase for Building A has been successfully completed. Now the nine-story block has new external insulation plus a rear-ventilated façade made of certified recycled aluminum. From an energy standpoint, all components are designed for maximum reduction in CO2 emissions.





